Connect with our senior engineering consultants to evaluate your plant's load profile, harmonic concerns, or statutory safety compliance.
We respond to all technical RFQs and audit inquiries within 24 hours. Send us your plant single-line diagram (SLD) or recent electricity bills for immediate analysis.
Complete this form to receive a structured diagnostic audit proposal.
No. Over 95% of our tests—including harmonic measurements, infrared thermography, clamp-on ultrasonic flow metering, and vibration analysis—must be conducted while the plant is operating under normal peak production load to capture real-time stresses. Only specific earth pit isolation and insulation resistance megger tests require momentary isolated clearance, which is coordinated with your electrical maintenance team.
A standard diagnostic audit typically takes 2 to 4 days on-site, depending on the contract demand, physical plant acreage, and number of sub-panels. The 24-hour load pattern and harmonic logging run continuously across shifts to capture batch cycles and night baseloads.
Yes. Our electrical safety audits are prepared in strict adherence to the Central Electricity Authority (CEA) Regulations 2023, National Electrical Code (NEC), and IS 3043. Our energy audits follow the Bureau of Energy Efficiency (BEE) and ISO 50001 framework, which are accepted by insurance surveyors, lenders, and regulatory bodies.
To maximize on-site efficiency, having the following ready is beneficial: (1) Plant Single Line Diagram (SLD), (2) Last 12 months electricity utility bills showing TOD breakdowns, (3) Equipment rating list for major motors, boilers, transformers, and compressors, and (4) Existing earth pit layout drawing.